You already fill it out.
Now you keep it.
Your hours Your work log A record you keep
Tap the screen to try it
Daniel's morning. One tap starts the day, and the form, the hours and the record all come from it.
Daniel's crew already does this on paper. Pick the stage, and only that work's hazards show.
Nobody typed these. The times came off this morning's form, so the hours are already his.
Every day he filed, still searchable months later. Filter by site, by task, by stage.
What the record adds up to: days on site, trades worked, tickets. His, not his employer's.
Four languages, and the form itself redraws, not just the menu. English stays beneath it as a check.
How he joins a crew. The foreman scans this. No admin, no employer needed on the system.
That is the whole form.
You filled it in once and it did three jobs. If you want the longer version of what you just signed, and why it matters after the shift, we wrote it down.
Read what an FLHA actually is
7:12
Home
DO
Daniel Okonkwo
Electrical · Pacific Ridge Construction
YOUR OWN SITE · PRIVATE
Granville Tower
Change
Ready when you are
You're set — work safe
On shift at Granville Tower · FLHA done.
7th Floor, East Wing · S07 — Rough-In
🛡
Field Level Hazard Assessment
The one form, before work starts
FLHAFri, Oct 2
Granville Tower
Electrical
Crew 3
Location
7th Floor, East Wing
Hazard
Electrical
Engineering Controls
GFCI on all temp power
Administrative Controls
LOTO — lock out, tag outVerify zero energy before work
Personal Protective Equipment (PPE)
Insulated tools for electrical work
Hazard
Falling objects from above
Engineering Controls
Tool tethering when working at height
Personal Protective Equipment (PPE)
Hard hatSteel-toed boots
Hazard
Fall from height — from Working at height
Engineering Controls
Guardrails in place at edges/openingsFloor openings covered and securedScaffold erected by competent person
Administrative Controls
Rescue plan reviewed with crew
Personal Protective Equipment (PPE)
Fall arrest — harness + anchor + lanyard
Requirements (2)
✓
TICKET
Working at Heights ticket, current
INSPECTION
Ladder inspected before use
1 still to arrange
✓
Filed.
Sent to your safety officer.
Stage of work
7th Floor, East Wing
S05 — Parkade
S07 — Rough-In
S08 — Finishing
Elevated Hazards
Does your crew's work area today include any of the following?
✓
Working at height
Overhead power lines visible
Open excavation or trench
Confined space entry
Hot work
or
None of the above
Site Conditions
Select any conditions that apply to your work area today
✓
Is lighting adequate in the work area?
Parkade, unfinished floor, stairwell
✓
Are walkways clear and in good condition?
Wet, icy, cluttered, or obstructed
Are weather conditions affecting the work today?
Heat, cold, rain, wind, ice
Is anyone on the crew working alone?
Alone on a floor, in a unit, or on site
or
No site conditions apply
What are you working on?
7th Floor, East Wing · S07 — Rough-In
ROUGH-IN
✓
Install conduit risers between floors for power and communication
✓
Install common area circuits — corridor, stairwell, lobby, mechanical room
Install FACP and annunciator panel
Suggested Hazards
These hazards are suggested for your tasks. Select which apply today.
✓
Falls from height
✓
Electrical shock / arc flash
✓
Struck by falling object
Manual handling
Fall from height
Fall from height
7th Floor, East Wing: Install conduit risers between floors for power and communication
Suggested ControlsTap to exclude any that don't apply
Engineering Controls
Guardrails in place at edges/openings
Floor openings covered and secured
Scaffold erected by competent person
not today
Administrative Controls
Rescue plan reviewed with crew
Personal Protective Equipment (PPE)
Fall arrest — harness + anchor + lanyard
Hold to confirm controls
Press and hold for 2 seconds
Sign and file
Your signature is on file. This files the form for today.
Daniel Okonkwo
Daniel Okonkwo
Electrical · Granville Tower
‹
Week ▾
›
33h
4 days worked · 1 site
Day 5 of 14
· Pays Sep 26
AllWorkedSickVacation
Sep 8 – Sep 14
33h
MON8
Granville Tower · 06:30–15:00 · 30m unpaid
FLHA
On site
From foreman
8h
TUE9
Granville Tower · 07:00–16:00 · 30m unpaid
FLHA
On site
From foreman
8.5h
WED10
Granville Tower · 06:30–17:00 · 60m unpaid
FLHA
From foreman
9.5h
THU11
Not logged
Repeat last
—
FRI12
Granville Tower · 07:30–15:00 · 30m unpaid
FLHA
On site
From foreman
Tap to see the day
7h
Every day here started as a hazard assessment, kept so you can find it later.
Day done · 7h
↳ from your foreman
siteGranville Tower
Start07:30
End15:00
Unpaid break30m
Log
Timesheet
‹
This week ▾
›
5 shifts · 5 days · 41h · 2 sites
Sep 12
Granville Tower/7th Floor, East Wing
Install conduit risers between floors +1
· S07 — Rough-In
with Ray Delgado
7h
Sep 11
Sick Off sick. Called Ray in the morning.
—
Sep 10
Granville Tower/7th Floor, East Wing
Install FACP and annunciator panel
· S07 — Rough-In
with Ray Delgado
9.5h
Sep 9
Granville Tower/Parkade P2
Install building-mounted and parking area lighting +1
· S05 — Parkade
with Ray Delgado
8.5h
Sep 8
Granville Tower/Parkade P2
Install bus duct and metering cabinet
· S05 — Parkade
with Ray Delgado
8h
Sep 5
Cambie Heights/Level 3
Install temporary receptacle stations
· S01 — Site Prep
8h
Nothing matches this filter.
DO
Daniel Okonkwo
Electrical · Pacific Ridge Construction
113
days on Nexo
since Jan 2026
Filed for a crew15
Signed as a crew14
Filed solo112
On a company's site49
Self-reported site92
Granville Tower
Pacific Ridge Construction
54 days
Cambie Heights
Pacific Ridge Construction
24 days
Foundation Builders site
Foundation Builders Inc.
35 days
Site Orientation
Granville Tower · Jan 2026
Site Orientation
Cambie Heights · Apr 2026
Electrical
84%
General Labour
16%
Toolbox talks
on 9 days · 8 subjects
Red Seal Electrician
Expires Dec 10, 2028
valid
Working at Heights
Expires Nov 16, 2027
valid
WHMIS
Expires Mar 31, 2027
valid
First Aid Level 1
Expires Oct 23, 2026
21d left
Confined Space Entry
Expires Aug 29, 2026
expired
Share of logged work · as logged
S01 — Site Prep
11%
Install temporary power distribution · Install temporary lighting
S05 — Parkade
17%
Install parkade lighting, emergency lighting, and exit signs · Install conduit runs in parkade slab and walls
S07 — Rough-In
39%
Install conduit runs and boxes · Pull wire and home run cables · Install common area circuits
S08 — Finishing
17%
Install receptacles, switches, and cover plates in suites · Install light fixtures per schedule
Share of logged work · as logged
S01 — Site Prep
11%
Assist with hoarding, fencing, and signage · Receive and unload deliveries at laydown area
S07 — Rough-In
3%
Clear floors and corridors between trade changeovers · Move materials and equipment to active floors
S08 — Finishing
2%
Remove all packaging, protective film, and waste from finished units daily
Pick your language
The whole app, not just this screen.
Tap one and the hazard assessment redraws in that language, the tasks and the hazards with it. The worker reads and signs in their own language; the form that gets filed and sent stays in English, so the safety officer reading it always can.
Daniel Okonkwo
Electrical
Your crew code
NEXO-4417
Show this to your foreman. They can scan it or type the code to add you to their crew.
Waitlist
Be there when it opens
Nexo is in early access with a small group of workers. Leave your name and we will email you the day it opens to everyone, in your language.
Free for workers. No employer needed. English, Punjabi, Spanish and French.
You are on the list.
We will email you the day it opens. Thanks for being early.
Questions? Write to us at [email protected]